These are some early pic's of the railroad being built. they started out as modules and when i moved to an apartment.only the two largest were saved and the legs taken off. and set them up in the closet.
|
the catpaw canyon yard
|
the tunnels are being made
|
the portal to the staging track and rock gorge yard,track goes behind the backdrop
|
there's going to be a ore mine here
|
as you can see here, the lower loop and the upper loop and a better view of the staging track to the rock gorge yard
|
the catpaw canyon bridge in the back ground,and the 2 turnouts going to the ore mine and the concrete plant
|
spaning the catpaw canyon, plans for a rapid river below and steep rock walls
|
the site of the lumber camp, and the plaster work is now in process
|
the lumber camp is an axcess hatch to the lower level and to the tunnel on the upper level.
|
on the bottom,tunnels to the grade track and the loop track.on top, the bridge to the concrete plant
|
a better view of the staging track behind the backdrop
|
proposed site for the engine house and shops.
|
the Rock Gorge yard, still under construction. those buildings wont be thier long !
|
building front's will be added to backbord to give depth to yard sceen.
|
GP-30 # 740 Rumble's out of the yard on it's next run
|
this is an arial view of the yard and the town of Rock Gorge. more yard tracks to be added
|
Image
|
Image
|
Image
|
Image
|
Image
|
|
Image
|
Image
|
Image
|
Image
|
Image
|
Image
|
Image
|
Image
|