Building The RG & CC R.R.
     
Home Page

Photo Page

What's New Page

Contact Page

Favorite Links

Photo2 Page

 


These are some early pic's of the railroad being built. they started out as modules and when i moved to an apartment.

only the two largest were saved and the legs taken off. and set them up in the closet.

the catpaw canyon yard

the tunnels are being made

the portal to the staging track and rock gorge yard,track goes behind the backdrop

there's going to be a ore mine here

as you can see here, the lower loop and the upper loop and a better view of the staging track to the rock gorge yard

the catpaw canyon bridge in the back ground,and the 2 turnouts going to the ore mine and the concrete plant

spaning the catpaw canyon, plans for a rapid river below and steep rock walls

the site of the lumber camp, and the plaster work is now in process

the lumber camp is an axcess hatch to the lower level and to the tunnel on the upper level.

on the bottom,tunnels to the grade track and the loop track.on top, the bridge to the concrete plant

a better view of the staging track behind the backdrop

proposed site for the engine house and shops.

the Rock Gorge yard, still under construction. those buildings wont be thier long !

building front's will be added to backbord to give depth to yard sceen.

GP-30 # 740 Rumble's out of the yard on it's next run

this is an arial view of the yard and the town of Rock Gorge. more yard tracks to be added

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image